Steel and concrete combination systems for added depth and durability with reduced material costs.
Polyurethane foam injection lifted the dining area slab during flooring renovations with minimal downtime.
Operations scheduled around the drive-thru lane to keep the restaurant open throughout construction.
Cardinal Foundation Services was contracted to support foundation stabilization and interior slab restoration during renovations of a Jack in the Box restaurant. Hybrid piers, a combination of steel and concrete systems, were installed along perimeter walls to provide added depth and durability while staying cost-effective.
Interior slab lifting in the dining area was completed using precision polyurethane foam injection, allowing clean and efficient restoration during flooring replacement. The team also coordinated closely with restaurant operations to work around the active drive-thru, ensuring no business interruptions throughout the project.



Free, no-obligation assessment. Commercial, residential, or new construction.
Tell us about your property and we'll schedule a free, no-obligation inspection. Your request routes to the right team: commercial, residential, or new construction.